sydngoose
Well-known member
Good morning, my friends,
I purchased a Lewmar Profish 700 windlass with the 3 switch remote to install on the 2120. I am going to remove the current anchor locker hatch and replace it with encapsulated (2) 3/4 inch marine ply w/ 1808 on both sides, thicken epoxy with cabosil, fare and gelcoat to match. It will be permenantly glassed in where the current anchor locker hatch is located. The 3 inch rise will allow the windlass to pay out the rode which is attached to a Delta 14 pound anchor. The reason WHY I am mounting the windlass in the location is to have the rode drop DIRECTLY on top of the deepest part of the anchor locker opposed to on the very aft portion of the pulpit which would drop the rode to the forward part of the compartment. My end result will be like this and be a permanent part of the hull: (photo borrowed from another Parker member)
My question is THIS:
I am having a rode made by "Secosouth" and I need to know the MAXIMUM amount of rode I safely fit into the anchor locker without compromising the ability of the windlass to pay out rode and also retrieve and stack the pile neatly in the locker (attempting to mitigate binding up).
I would like to order 260 feet of 8 plait nylon 1/2 inch rope spliced to 25 feet of G4 chain. Would this fit in the current bow locker? I DID call Parker this morning, and Robyn was not able to answer my question, so she told me to send them an email and hopefully technical support can answer it later today. But, does anyone here have real world experience with this situation??
Thank you in advance. My current bow set up:
I purchased a Lewmar Profish 700 windlass with the 3 switch remote to install on the 2120. I am going to remove the current anchor locker hatch and replace it with encapsulated (2) 3/4 inch marine ply w/ 1808 on both sides, thicken epoxy with cabosil, fare and gelcoat to match. It will be permenantly glassed in where the current anchor locker hatch is located. The 3 inch rise will allow the windlass to pay out the rode which is attached to a Delta 14 pound anchor. The reason WHY I am mounting the windlass in the location is to have the rode drop DIRECTLY on top of the deepest part of the anchor locker opposed to on the very aft portion of the pulpit which would drop the rode to the forward part of the compartment. My end result will be like this and be a permanent part of the hull: (photo borrowed from another Parker member)
My question is THIS:
I am having a rode made by "Secosouth" and I need to know the MAXIMUM amount of rode I safely fit into the anchor locker without compromising the ability of the windlass to pay out rode and also retrieve and stack the pile neatly in the locker (attempting to mitigate binding up).
I would like to order 260 feet of 8 plait nylon 1/2 inch rope spliced to 25 feet of G4 chain. Would this fit in the current bow locker? I DID call Parker this morning, and Robyn was not able to answer my question, so she told me to send them an email and hopefully technical support can answer it later today. But, does anyone here have real world experience with this situation??
Thank you in advance. My current bow set up: