Well the gas tank installation is almost done. I purchased boat with cockpit floor cut ,old tank removed and new tank uninstalled. Bob Stine of Black Dog Boat Works is doing the work. He made beds for the new tank to sit on using non corrosive materials ,"No foam". Installed new bulkheads closed unused extra holes in the hull, used an aluminum beam to support decking. Cockpit floor is now readdy for finishing. He also removed the RV roof air and installed a hatch. attached are some pictures of this project.Look forward for a sea trial soon. Next repair will be the floors and stringers in cabin floor. Mike