Capt. John Deering
Well-known member
i think this was discussed at some point here, cannot find old post.
problem: 23se, when retrieving the danworth type anchor and winding the rode back in the locker, their is NEVER enough room for the anchor itself, i have to mess around with the rode to get the anchor back in the locker and be able to close the locks and lid.
a friend suggests get a 4-5" piece of pvc and put it in the anchor locker well.......then wind the rode around that, once completed put anchor inside the pvc tube.
i think it would work put how would you mount the PVC without needing another pair of hands to keep the pvc centered?
is this clear as mud???
problem: 23se, when retrieving the danworth type anchor and winding the rode back in the locker, their is NEVER enough room for the anchor itself, i have to mess around with the rode to get the anchor back in the locker and be able to close the locks and lid.
a friend suggests get a 4-5" piece of pvc and put it in the anchor locker well.......then wind the rode around that, once completed put anchor inside the pvc tube.
i think it would work put how would you mount the PVC without needing another pair of hands to keep the pvc centered?
is this clear as mud???