So I ordered factory rod holders from Parker a few months ago and just got around to test mounting them. There is a less than a .125” gap and the mounting surfaces don’t lie flush.
I was going to mount the two if the three screws on the plates and the last one until it’s flush but I’m concerned it will introduce stress into the weld. However, It’s somewhat flexible overall. It has a total of three mounting points locations (two in the photos and one in the middle, so even if it doesn’t lay flush it will have sufficient support.
Any thoughts on this?
Is it preferred to mount these directly to the fiberglass or should I add the foam sheet like the rails and bow rails have?
Does anyone know the name of the foam sheet? This
I was going to mount the two if the three screws on the plates and the last one until it’s flush but I’m concerned it will introduce stress into the weld. However, It’s somewhat flexible overall. It has a total of three mounting points locations (two in the photos and one in the middle, so even if it doesn’t lay flush it will have sufficient support.
Any thoughts on this?
Is it preferred to mount these directly to the fiberglass or should I add the foam sheet like the rails and bow rails have?
Does anyone know the name of the foam sheet? This
15 Pack Adhesive 1/16" Thick Neoprene Rubber Sheets, 12"x12" Sponge Foam Pads?
Attachments
Last edited: