- Joined
- Mar 7, 2021
- Messages
- 127
- Reaction score
- 11
Hey Everyone,
I recently purchased a 2001 21 SE that doesn't have a livewell or pump. Sooooo on top of all of the other little projects I have, this one is a must for me.
Already picked up a 40 gallon livewell that fits nicely under the custom leaning post the previous owner had.
Now it's time to drill a hole and work on plumbing.
I'd love any and all recommendations on through hull size and ideal location. I'm thinking port side close to the plug since the transducer is going to be installed starboard.
Is a high speed pick up typically necessary for this hull as well?
Fire away, I'm all ears.
Thanks in advance!
I recently purchased a 2001 21 SE that doesn't have a livewell or pump. Sooooo on top of all of the other little projects I have, this one is a must for me.
Already picked up a 40 gallon livewell that fits nicely under the custom leaning post the previous owner had.
Now it's time to drill a hole and work on plumbing.
I'd love any and all recommendations on through hull size and ideal location. I'm thinking port side close to the plug since the transducer is going to be installed starboard.
Is a high speed pick up typically necessary for this hull as well?
Fire away, I'm all ears.
Thanks in advance!